Overview of 2SJ3 angular stroke electric actuator

4.2 working principle
Is the block diagram of M series power controller system.
4.2.1 open-loop control (MK, MDK)
Impulse control: the electric actuator is controlled by input "on", "off" and "stop" signals.
Maintain type control: electric actuator by typing "open" and "close to" impulse control, pulse width should be acuity lOOms.
Closed-loop control (MU, MD)
The continuous automatic adjustment signal (4-20ma) sent by the external regulator is input by channel l. The set value of the input position is converted by A and D to be compared with the actual position, so as to carry out accurate automatic adjustment control.
The continuous regulating pulse signal (DC24V) sent by the external regulator is input by pass 2, and the set value of the input position is compared with the actual position after A/D conversion, so as to automatically adjust accurately.
4.2.3 the control function of M series power controller is realized by the internal program of 89C51 microprocessor inside the controller.
FIG. 1 block diagram of M series power control system
Installation and debugging
5.1 installation
Install the actuator according to site conditions. If the working conditions are bad, the M series power controller can be installed separately with the actuator. MU, MD (MDK) and MK can connect externally according to the wiring diagram in FIG. 2, FIG. 3 and FIG. 4 respectively. After confirmation, power is switched on. In the figure, S12 and S11 are respectively the terminal signal passive contact output of on and off trip switch, and j1-j4 is the output of normally open contact of relay for users to use.
5.2 debugging
5.2.1 M series power controller can be operated in the "remote" or "local" state respectively. When the power is switched on and off, the controller will be in the "remote" state and debugging on the spot. Press the switch key to the "local" state to start, close and stop the key operation on the operation panel.
5.2.2 if the rotation direction of the electric actuator is opposite to that of the valve, MU and MK shall replace the phase sequence of the power input line, and MD and MDK shall switch the terminals 2 and 3 of terminal X401 on the host board.
5.2.3 signal gear adjustment is directly related to valve position signal. Please refer to the relevant sections of "switch and signal adjustment" in operation manual of electric actuator 2SA3, 2SB3, 2SQ3 or 2SJ3.
5.2.4 after signal gear adjustment, if the valve position display is inconsistent with the valve switch direction, then turn the valve position direction switch on the host board (1, 2, 3, 4).
5.2.5 adjust zero position: press the turn key to fully close the valve, adjust to travel S3 action (close >, then break off the POT potentiometer gear and signal gear, feedback current If=2mA from the rotating potentiometer to the valve position, then return the POT, adjust 0% potentiometer on the host board to If=4mA, display oo on the panel.
5.2.6 full adjustment: press the open button to the fully open position of the valve, and adjust to travel S4 action (close), then adjust the lOO% potentiometer on the host board to If=20mA, and the digital tube on the operation panel displays 99. Because the zero position and the full degree affect each other slightly, sometimes needs to adjust several times repeatedly.
5.2.7 torque values of SI and S2 of electric actuator torque control switches have been set according to user requirements before leaving the factory.
5.2.8 in "on" or "distant" operation, the luminous tube on operating the pulp board shows the working state of the valve (MK the distance the indicator lights on the panel display) at the same time, the valve is in middle position, the red and green light are in the process of open valve, red light flashing (1 / S), the green light in the process of closing valve COINS, green light flash (1 / S), turns red, the valve is in full open position, the green light, red light valve in a seated position, the red light, green light
5.2.9 display state of local indicator (MK distant indicator) during fault diagnosis:
Turning over torque fault, red light flashing (2 times, S)
Turn-off over-torque failure, green light flashing (2 times, S)
Motor overload fault, thermal control switch action, red light and green light flashing alternately (2 times, S)
(the above three phenomena, after troubleshooting, the light will automatically return to the original state, travel control and mechanical failure, red light and green light flashing at the same time (2 lS)
(press "on", "off" or "stop" at the same time to reset, and the light will automatically return to its original state)
Vi. Matters needing attention
6.1m series power controllers are automatically in the "remote" state when powered on
6.2 if user when using computer control the pulse in the distance, its operating pulse width should be acuity lOOmS
6.3 when the remote indicator is selected, its operating current should be <50mA
6.4 valve position feedback current 4-20ma, its external load should be ≤300 Q
6.5 if the customer has other technical requirements, special orders may be made upon agreement. The electrical machinery and equipment are used under conditions of high industrial current. During operation, some exposed parts of the equipment are electrified, and some parts can move or rotate, which is very dangerous. Therefore, removing the required cover without permission, improper use, incorrect operation or improper maintenance can cause serious personal injury or damage to the performance of the equipment. For the safety of the equipment, it must be ensured that: - only qualified personnel are allowed to operate the machinery and equipment. At all times when such qualified personnel shall operate such machinery and equipment, they shall have an operation manual or other product document for such machinery and equipment to be carried out in accordance with the instructions. Operation of or near the machinery and equipment by unqualified personnel shall be strictly prohibited

Order Online Message

Order
Name
Telephone
Email
Submit Order Now   >
Consult   >
主站蜘蛛池模板: 久久有码中文字幕| 国产亚洲一区呦系列| 久草新视频| 国产福利自产拍在线观看| 国内精品七七久久影院| 牛牛影院毛片大全免费看| 国产 日韩 欧美 亚洲| 久久综合中文字幕一区二区| 久久中文精品| 精品视频 九九九| 国产一卡2卡3卡免费网站| 操金发美女| 国产美女精品在线| 黄色的视频网站在线观看| 国产精品女同一区二区久久夜| 精品一区久久| 理论片人人51| 九九热在线精品| 国产91在线免费| 国产91在线播放中文| 国产精品一区在线观看| 毛片机地| 久久激情五月| 高清国产视频| 免费看片在线| 男女无遮挡免费视频| 国产麻豆精品高清在线播放| 国产91免费在线| 久久99精品一级毛片| 干干干操操操| 精品国产一区二区三区久久影院 | 国产免费一区不卡在线| 麻豆 mp4| 精品国产九九| 久久精品国产亚洲a不卡| 国产精品免费综合一区视频| 久久国产免费观看精品| 精品视频专区| 久爱精品视频在线视频| 成人a毛片在线看免费全部播放| 国产福利在线观看视频|